Sewage Treatment Plants & Septic Tanks
Clearwater Delta 2, Delta 3 or Delta 4 sewage treatment plant.
  • Clearwater Delta 2, Delta 3 or Delta 4 sewage treatment plant.
  • Cross section of Clearwater Delta2, Delta 3 or Delta 4 sewage treatment plant.

18 Person Clearwater Delta 3 Sewage Treatment Plant

5-7 working days
From £4,876.18
£4,876.18 - £4,912.79
From £4,063.48 (Ex. VAT)
Free Delivery (Restrictions Apply)

Delivery from £15 5-7 working days

Carbon neutral delivery from JDP vehicles

Return within 30 days for a full refund

Product Details

Specifications

Inhabitants: Up to 18 people
Max daily flow: 3600 litres (3.6m3)
Length: 3976mm
Width: 1916mm
Height (750mm invert): 2470mm
Height (1000mm invert): 2720mm
Depth to inlet invert level: 750mm / 1000mm
Fall between inlet & outlet: 100mm
Pipe & Fittings: 110mm

Effluent Quality

BOD5: 20 mg/l
NH4: 20 mg/l
SS: 30 mg/l

The Clearwater Delta range uses fluidised, fixed-film biozones to produce a cleaner, quieter and more efficient unit. This allows a simple and trouble free solution to sewage treatment. On top of this, the shallow design of this tank also offers a quicker and more cost effective excavation on site. It’s a win – win!

This Delta 3 sewage treatment plant has 3 turrets with a pedestrian loading cover only, suitable for gardens landscaped areas but not for traffic. Install the tank under a concrete cover slab for traffic areas.

A sewage treatment plant does what it says on the tin; it treats sewage to make the discharge cleaner than the effluent that comes out of a septic tank. This means it can be discharged straight into a local watercourse or soakaway (subject to site conditions). With the new legislations being put in place for septic tank discharge in 2020, choosing a sewage treatment plant is a positive forethought to future legalities.

  • Unobtrusive below ground installation
  • Low profile results in shallow depth excavation
  • Suitability for varying invert levels
  • Excellent durability
  • Compliant with BS EN-12566 Part 3 & CE marked
  • Sludge recycle pump in the final settlement tank
  • Simple maintenance with easy desludging

 

Availability:
5-7 working days
Population:
13-24 Persons
Install Type:
Standard
Make:
Clearwater
Product Type:
Sewage Treatment Plant

Also In This Range